orca build part10
Now the flying bridge is 90% complete it has been put to one side, I tend to work like this, jumping from component to component. I seem to get better inspiration this way and it keeps the build from going stale, and keeping the old grey cells turning over, as there is always another challenge with the next component waiting to be made.
So picking up from earlier in the build I went back to making the wheelhouse and forward cabin. Looking at earlier photos you may have noticed the sides of the wheelhouse in place, including the front wind shield and cabin sides, again made and left until later in the build, otherwise the blog would jump all over the place.
These side walls were again made using 2mm foam board, I tried building the window frames, etc. in balsa but they were too fragile. The wheelhouse, cabin side and the aft deck firring were then able to be produced in one piece, which was not possible with balsa. I intend to frame the window openings with mahogany strip later when the superstructure is painted.The internal cabin finish will also be dark stained paneling, another idea tumbling around my head for a later date.
I acquired 6 brass 15mm portholes so at this stage cut the holes to accept these, hope i remembered were they are, come the day to fit!.
Foam board was used also to make the wheelhouse and cabin roof, I backed up the roof panels with pine strip to stiffen and help locate, as these are removable for access. Also made was the bow bulwarks which extend only as far as half way along the forward cabin, I suppose these act as a splash guard in this design of craft, fixing these in place also helped with the positioning of the pulpit floor and pulpit handrails